DCT tracks and displays Hyperscale job progress, including pre-execution steps and parallel execution status.=

Viewing execution history

  1. Navigate to Compliance > Compliance Jobs and click the Hyperscale-enabled job.

  2. Select the Execution Historytab to see a list of all executions. The execution list displays the following columns: Status, Job Name, Orchestrator, Started By, Start Time, Duration, Rows Masked, and Engines.

  3. Click View on a specific execution to open the execution details page.

Execution details

The execution details page provides a real-time view of the Hyperscale masking pipeline. Each stage is displayed with a progress bar, run time, and row count:

  • Step 0 — Unload: Data is extracted from the source database and split into chunks.

  • Step 1 — Masking: Masking algorithms are applied to the extracted data across multiple Compliance Engines in parallel.

  • Step 2 — Load: Masked data is loaded back into the target database.

  • Step 3 — Post Load: Post-processing tasks (such as index recreation and constraint re-enablement) are completed.

The details section also displays the Job Name, Job ID, Source Connector, Rule Set, Compliance Job Type, Hyperscale Enabled status, and the list of Hyperscale Engines participating in the execution.

The job Overview page also shows a RUNNING status banner with the execution start time and a View Job Execution Details link for quick access to the execution progress.

 

Last updated
Oct 8, 2026